Integrated model for the stressors, stress, stress-coping behaviour of construction project managers in the UK

Article


Naoum, S. G., Herrero, C., Egbu, C. and Fong, D. 2018. Integrated model for the stressors, stress, stress-coping behaviour of construction project managers in the UK. International Journal of Managing Projects in Business. 11 (3), pp. 761-782. https://doi.org/10.1108/IJMPB-07-2017-0071
AuthorsNaoum, S. G., Herrero, C., Egbu, C. and Fong, D.
Abstract

Purpose

It is axiomatic that construction is a fast-paced and competitive industry, which goes hand in hand with many construction professionals suffering from stress including construction project managers (C-PMs). The role of C-PMs is crucial to achieving project success as they are responsible for planning the project, organising human resources, controlling operations and the budget, and forecasting probable difficulties. The purpose of this paper is to investigate the causal relationships between stressors, stresses, stress-coping behaviours and their impact on the performance of C-PMs.

Design/methodology/approach

To investigate the relationships between stress and performance among C-PMs, a questionnaire was designed based on the extensive literature, and was sent to 150 C-PMs who had amassed at least five years’ direct working experience in the construction industry. A total of 44 completed questionnaires were returned. Correlation analysis and structural equation modelling were employed to understand the integrated relationships between these factors. Based on the data collected and analysis of the results, an integrated structural equation model of the stresses and performances of C-PMs was developed using AMOS version 22.0.

Findings

The results of structural equation modelling reveal the following: burnout is the type of stress that has the highest impact on the performance of C-PMs, being detrimental to their interpersonal performance (IPP) and positive for their organisational performance (OP), whereas physiological stress worsens the task performance of C-PMs and objective stress improves their IPP. The most active stressor towards the performance of C-PMs is “workgroup cooperation”, which has an impact on the IPP in a positive way but is detrimental to the OP. Career-developing environment, poor organisational structure and role conflict affect both stress and performance together.

Originality/value

This study provides a comprehensive investigation into the impact of various types of stress on the performances of C-PMs. The result constitutes a significant step towards the stress management of C-PMs in the dynamic and stressful construction industry.

JournalInternational Journal of Managing Projects in Business
Journal citation11 (3), pp. 761-782
ISSN1753-8378
Year2018
PublisherEmerald Publishing
Accepted author manuscript
License
File Access Level
Anyone
Digital Object Identifier (DOI)https://doi.org/10.1108/IJMPB-07-2017-0071
Web address (URL)https://doi.org/10.1108/IJMPB-07-2017-0071
Publication dates
Online02 Jul 2018
Publication process dates
Accepted02 Feb 2018
Deposited12 Sep 2019
Copyright holder© 2018 Emerald Publishing Limited
Permalink -

https://repository.uel.ac.uk/item/87068

Download files


Accepted author manuscript
PDF_Proof.pdf
License: CC BY-NC 4.0
File access level: Anyone

  • 215
    total views
  • 178
    total downloads
  • 7
    views this month
  • 2
    downloads this month

Export as

Related outputs

Risk identification framework in construction of Egyptian mega housing projects
Nabawy, M., Ofori, G., Morcos, M. and Egbu, C. 2020. Risk identification framework in construction of Egyptian mega housing projects. Ain Shams Engineering Journal. 12 (2), pp. 2047-2056. https://doi.org/10.1016/j.asej.2020.09.016
Critical analysis for big data studies in construction: significant gaps in knowledge
Madanayake, U. H. and Egbu, C. 2019. Critical analysis for big data studies in construction: significant gaps in knowledge. Built Environment Project and Asset Management. 9 (4), pp. 530-547. https://doi.org/10.1108/BEPAM-04-2018-0074
Gender in the Construction Industry: Literature Review and Comparative Survey of Men’s and Women’s Perceptions in UK Construction Consultancies
Naoum, S. G., Harris, J., Rizzuto, J. and Egbu, C. 2019. Gender in the Construction Industry: Literature Review and Comparative Survey of Men’s and Women’s Perceptions in UK Construction Consultancies. Journal of Management in Engineering. 36 (2). https://doi.org/10.1061/(ASCE)ME.1943-5479.0000731
Modelling Knowledge Integration Process in Early Contractor Involvement Procurement at Tender Stage - A Western Australian Case Study
Hastie, J., Sutrisna, M. and Egbu, C. 2017. Modelling Knowledge Integration Process in Early Contractor Involvement Procurement at Tender Stage - A Western Australian Case Study. Construction Innovation. 17 (4), pp. 429-456. https://doi.org/10.1108/CI-04-2016-0021
Knowledge sharing maturity model for Jordanian construction sector
Arif, M., Al Zubi, M., Gupta, A. D., Egbu, C., Walton, R. O. and Islam, R. 2017. Knowledge sharing maturity model for Jordanian construction sector. Engineering, Construction and Architectural Management. 24 (1), pp. 170-188. https://doi.org/10.1108/ECAM-09-2015-0144
The impact of IEQ on occupants’ satisfaction in Malaysian buildings
Kamaruzzaman, S. N., Egbu, C., Mahyuddin, N., Zawawi, E. M. A., Chua, S. J. L. and Azmi, N. F. 2017. The impact of IEQ on occupants’ satisfaction in Malaysian buildings. Indoor and Built Environment. 27 (5), pp. 715-725. https://doi.org/10.1177/1420326X16689493
Modern selection criteria for procurement methods in construction
Naoum, S. G. and Egbu, C. 2016. Modern selection criteria for procurement methods in construction. International Journal of Managing Projects in Business. 9 (2), pp. 309-336. https://doi.org/10.1108/IJMPB-09-2015-0094
Fresh driver for economic growth: fracking the UK nation
Ochieng, E. G., Price, A. D. F., Egbu, C., Ruan, X. and Zuofa, T. 2015. Fresh driver for economic growth: fracking the UK nation. International Journal of Energy Sector Management. 9 (3), pp. 412-431. https://doi.org/10.1108/IJESM-10-2014-0004