Contractor-led design risk management in international large project: Korean contractor’s perspective
Article
Whang, S., Donyavi, S., Flanagan, R. and Kim, S. 2022. Contractor-led design risk management in international large project: Korean contractor’s perspective. Journal of Asian Architecture and Building Engineering. 22 (3), pp. 1387-1398. https://doi.org/10.1080/13467581.2022.2085718
Authors | Whang, S., Donyavi, S., Flanagan, R. and Kim, S. |
---|---|
Abstract | In contemporary international large-scale projects (LSPs), where heavy responsibilities are placed on the contractor, the contractor needs to manage all design-related issues for production activities, unlike traditional design management. To mitigate the contractor’s design-related risks from |
Keywords | Design risk management; International construction; Korean contractor |
Journal | Journal of Asian Architecture and Building Engineering |
Journal citation | 22 (3), pp. 1387-1398 |
ISSN | 1347-2852 |
Year | 2022 |
Publisher | Taylor & Francis |
Publisher's version | License File Access Level Anyone |
Digital Object Identifier (DOI) | https://doi.org/10.1080/13467581.2022.2085718 |
Publication dates | |
Online | 16 Jun 2022 |
Publication process dates | |
Accepted | 28 May 2022 |
Deposited | 25 Oct 2023 |
Funder | Yeungnam University |
Copyright holder | © 2022, The Authors |
https://repository.uel.ac.uk/item/8ww8y
Download files
Publisher's version
Contractor-led design risk management in international large project Korean contractor s perspective.pdf | ||
License: CC BY 4.0 | ||
File access level: Anyone |
82
total views36
total downloads1
views this month0
downloads this month