Dr Seoung Wook Whang


NameDr Seoung Wook Whang
ORCIDhttps://orcid.org/0000-0003-3683-7008
Job titleLecturer
Email addresss.w.whang@uel.ac.uk
Research instituteArchitecture, Computing & Engineering

Research outputs

Selection of Optimized Retaining Wall Technique Using Self-Organizing Maps

Kim, Y-S., Park, U-Y., Whang, S., Ahn, D-J. and Kim S. 2021. Selection of Optimized Retaining Wall Technique Using Self-Organizing Maps. Sustainability. 13 (Art. 1328). https://doi.org/10.3390/su13031328

Critical Success Factors for Implementing Integrated Construction Project Delivery

Whang, S., Park, K. and Kim, S. 2019. Critical Success Factors for Implementing Integrated Construction Project Delivery. Engineering, Construction and Architectural Management. 26 (10), pp. 2432-2446. https://doi.org/10.1108/ECAM-02-2019-0073

Comparison of High-Strength Steel Pipe and H-Shaped Steel in the Strut of a Braced Wall System

Kim, S., Whang, S., Lee, Y., Shin, Y. and Kim, G. 2018. Comparison of High-Strength Steel Pipe and H-Shaped Steel in the Strut of a Braced Wall System. Journal of Asian Architecture and Building Engineering. 16 (1), pp. 179-184. https://doi.org/10.3130/jaabe.16.179

Application of extended end composite pile design in pile foundation work

Kim, S., Whang, S., Kim, S. and Hyung, W. G. 2017. Application of extended end composite pile design in pile foundation work. Proceedings of the Institution of Civil Engineers - Geotechnical Engineering. 170 (5), pp. 455-465. https://doi.org/10.1680/jgeen.16.00043

Contractor-Led Critical Design Management Factors in High-Rise Building Projects Involving Multinational Design Teams

Whang, S., Flanagan, R., Kim, S. and Kim, S. 2016. Contractor-Led Critical Design Management Factors in High-Rise Building Projects Involving Multinational Design Teams. Journal of Construction Engineering and Management. 143 (5). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001242

Building Information Modeling (BIM) for Project Value: Quantity Take-Off of Building Frame Approach

Whang, S. and Park, S. M. 2016. Building Information Modeling (BIM) for Project Value: Quantity Take-Off of Building Frame Approach. International Journal of Applied Engineering Research. 11 (12), pp. 7749-7757.

Comparative study on the construction cost including carbon emission cost for masonry walls

Kim, S., Whang, S., Kim, G. and Shin, Y. 2015. Comparative study on the construction cost including carbon emission cost for masonry walls. Energy and Buildings. 96, pp. 187-192. https://doi.org/10.1016/j.enbuild.2015.03.025

Balanced sustainable implementation in the construction industry: The perspective of Korean contractors

Whang, S. and Kim, S. 2015. Balanced sustainable implementation in the construction industry: The perspective of Korean contractors. Energy and Buildings. 96, pp. 76-85. https://doi.org/10.1016/j.enbuild.2015.03.019

Determining sustainable design management using passive design elements for a zero emission house during the schematic design

Whang, S. and Kim, S. 2014. Determining sustainable design management using passive design elements for a zero emission house during the schematic design. Energy and Buildings. 77, pp. 304-312. https://doi.org/10.1016/j.enbuild.2014.03.066
  • 1170
    total views of outputs
  • 2734
    total downloads of outputs
  • 2
    views of outputs this month
  • 10
    downloads of outputs this month